Best Practices Version 20.0

Search or Filter

Search Best Practices

Filter by Industry Icons

Table of Contents

Submit a Best Practice Proposal

Download a Copy

Purchase a Book

Access Best Practices Toolkit

Chapter 2

2.11 As-built Drawings

Practice Statement:

As-built drawings are prepared and the information is recorded to aid future excavations and locates.

Practice Description:

Installation is made in accordance with the approved construction plans. Any deviation to the plans is documented and such changes are indicated on the as-built drawings. As-built information is recorded, retained, and made available for subsequent excavation.

Benefits:

As-built drawings serve as an information source for future projects to minimize damage to existing facilities.

References:

  • Union Pacific Railroad procedures
  • Expert opinion.
  • Industry and governmental practices

Submit a Best Practice Proposal

Download a Copy

Purchase a Book

Access Best Practices Toolkit

Damage Prevention in Your State

Explore damage prevention information, local contacts and rules for safe digging in North America.

Find Your State

CGA Toolkits

CGA has created a suite of toolkits designed to help members generate public awareness about the importance of damage prevention.

Explore Resources